Register for Subscriber and Special Privilege
AP 360°
Concept

Project Detail

Project name

RHYTHM Sathorn

Developer

AP (Thailand) Public Company Limited

Supported by

Siam Commercial Bank Public Company Limited

Location

Soi Sathorn 21, South Sathorn Road, Yan Nawa Sub-district, Sathorn District, Bangkok

Total project area

Approx. 4-1-91.6 rai (1,791.6 square wah)

General description

North Building: A 37-storey residential building with a 4-storey basement
• B4 – B1: parking spaces
• 1st – 2nd floor: entrance lobby and communal facilities
• 3rd – 35th floor: residential units
• 36th – 37th floor: communal facilities
South Building: A 41-storey high residential building with a 4-storey basement
• B4 – B1: parking spaces
• 1st – 2nd floor: entrance lobby, communal facilities and the office of the condominium juristic Person
• 3rd – 39th floor: residential units
• 40th – 41st floor: communal facilities

No. of units

910 units

Facilities

North Building
• 1st floor: entrance lobby and communal garden
• 36th floor: swimming pool, multipurpose room, garden and separate male and female saunas
• 37th: fitness room
• 4 high-speed passenger lifts and 1 high-speed firefighting lift
South Building
• 1st floor: entrance lobby and communal garden
• 2nd floor: the condominium juristic person office
• 40th floor: swimming pool, multipurpose room, garden and separate male and female saunas
• 41st floor: fitness room
• 4 high-speed passenger lifts and 1 high-speed firefighting lift
• 1 firefighting lift for access to all basement floors, shared between the two buildings.
* Comprising 1 bedroom and 1 multipurpose room that can be converted into an additional bedroom

Total parking capacity

Approx 580 cars (double-parked cars are included)
Facility
Speed up, slow down: state-of-the-art-sport and leisure facilitiesAn instant of joy that lasts for eternity
Room Type

ONE BEDROOM

NA1
NA6
NA7
NA8
NA9
NB2
NB5
NB10
NB11
NB12
NB13
SA1
SA6
SA7
SA8
SA9
SB2
SB10
SB11
SB12
SB13

TWO BEDROOM

NC3
NC4
SC3
SC4
SC5
Floor Plan
Progress Latest update : JULY, 2015
* project progress update on 15th every month.
100%
Structural Work
100%
Architectural Work
97%
System Installation
96%

Subscribe project's news

Coordinates (13.7179,100.51694)
* The company reserves the right to change the above mentioned details without prior notice.